STACK takeoff to JobTread budget
Drop in a STACK takeoff export, check the totals, download the file for JobTread. Everything runs in this browser tab; nothing is uploaded anywhere.
1Add the STACK export
Any job's takeoff breakdown CSV from STACK. Line items can be anything; extra columns and column order don't matter.
2Check the totals
Add a STACK export above to see its lines here.
Travel
Is this a travel job? Picking Commute or Lodging writes the catalog travel group into the base bid and into each alternate, so nothing has to be pulled in by hand. After import, type Labor Cost and Crew Size in the job's parameters.
Options (usually nothing to change here)
Units
STACK's units are converted to Premium Painting's JobTread units automatically. Only change one if it's flagged above.
3Download and import
The download unlocks once a STACK export is loaded.
- In JobTread, open the job's Budget tab, choose Import, and select the downloaded file. Check that Cost Group, Cost Item Name, Quantity, Quantity Formula, Unit, Unit Cost Formula, Unit Price Formula, Cost Type and Cost Code are mapped.
- Each takeoff comes in as its own group with two lines: "- Labor" and "- Materials". Type the labor rate into Unit Cost on the Labor line and the material rate into Unit Cost on the Materials line. The group row shows that item's total. Then check the budget's quantities against the totals in step 2.
- If you picked Commute or Lodging in step 2, the travel groups come in with the import and their parameters appear under the budget's Parameters button. Type the Labor Cost and Crew Size for Base Bid and for each Extra (Extra 1 goes with Alternate 1, and so on; an alternate numbered above 7 uses a free Extra, shown in the travel message in step 2); drive time, fuel, lodging and per diem calculate from those.
- An allowance (any takeoff with "allowance" in its name) comes in like any other item, a Labor line and a Materials line, and sorts last in its bid. Split the dollar amount between the two the way Forrest does.
- Need an extra item? Add a cost group inside the bid named for the item, then add a "- Labor" line (Cost Type Labor) and a "- Materials" line (Cost Type Materials) and type their Unit Cost.
- For total labor and total materials, switch the budget to the Cost Summary view (grouped by Cost Type). That view includes alternates; the proposal page's cost summary splits them out.